Borewell Pump Operation Optimization Using Data-Driven Priority Selection

A data-driven priority method for borewell pumps that balances efficiency, operating hours, and equipment wear—plus a staged path toward DCS use.

ML
Mehedi Hossen Limon
Engineer · Talibul Ilm · Writer
· 3 min read · 494 words

Multiple borewell pumps can often meet the same water demand, but they are not equal in efficiency, operating hours, or accumulated starts.

A simple lead/lag sequence can run reliably and still leave an open question:

When several pumps can do the same duty, which available pump should start first?

This note describes a data-driven priority approach for borewell pumps. The aim was not only to favour the most efficient machine, but to balance three requirements:

  • reduce energy use
  • spread operating hours reasonably
  • limit starting-related wear

Those factors are combined into a weighted priority score that can sit in a supervisory calculation and feed DCS start/stop selection—without replacing protection logic.

1. Initial data analysis

Seven active borewell pumps were reviewed using monthly operating data, including:

  • running hours
  • average voltage and current
  • power factor
  • calculated power
  • flow rate
  • total water produced
  • total energy use
  • flow per unit power

For the analysed period:

QuantityValue
Total water production14,523.58 m³
Total energy consumption2,818.74 kWh
Average specific performance≈ 5.15 m³/kWh

Individual pumps differed clearly in water delivered per unit energy. Treating every pump as equal can therefore waste energy.

2. Why efficiency alone is not enough

The most efficient pump should not necessarily run almost all the time.

If the system always picks the best efficiency unit, that pump can accumulate far more hours and starts than the others. Energy optimisation then becomes a second problem: utilisation and wear.

Selection was therefore split into three weighted factors:

FactorWeightObjective
Efficiency50%Favour lower energy per unit water
Operating-hour balance30%Avoid concentrating runtime on one machine
Wear / health20%Reflect starts and condition

Weights are engineering assumptions. They should be reviewed after more operating data is collected.

3. Normalised scores

Efficiency

Specific energy consumption:

$$ \mathrm{SEC}_i = \frac{\mathrm{Energy}_i}{\mathrm{Flow}_i} $$

Lower SEC is better. A normalised efficiency score:

$$ E_i = 1 - \frac{\mathrm{SEC}i - \mathrm{SEC}{\min}}{\mathrm{SEC}{\max} - \mathrm{SEC}{\min}} $$

If flow per power (m³/kWh) is used directly, it can be normalised so that higher performance scores higher.

Operating-hour balance

Pumps with fewer accumulated hours score higher:

$$ H_i = 1 - \frac{\mathrm{Hours}i - \mathrm{Hours}{\min}}{\mathrm{Hours}{\max} - \mathrm{Hours}{\min}} $$

This stops the most efficient pump from becoming permanently dominant.

Wear / health

Starts can be an initial proxy. A richer score can later combine recent starts, trips, power factor, current vs baseline, vibration, bearing/motor temperature, and other available indicators.

An unhealthy pump must not be preferred only because it once looked efficient on paper.

4. Composite score and ranking

$$ S_i = 0.5,E_i + 0.3,H_i + 0.2,W_i $$

Pumps are ranked from highest (S_i) to lowest. From the analysed dataset, one ranking was:

Pump-10 → Pump-8 → Pump-6 → Pump-7 → Pump-9 → Pump-5 → Pump-11

The order is not permanent. It should be recalculated as conditions and health change.

5. Priority calculation vs sequencing

These are different jobs.

Priority calculation (supervisory):

Operating data
  → Normalise parameters
  → Weighted score
  → Rank pumps
  → Publish priority order